All projects
Family House, Murvica
Electrical Installations / Grounding Systems

Family House, Murvica

Murvica, Zadar2024/25

Challenge

Installation of a foundation earthing system according to the execution project at a location with specific geological conditions (limestone/karst).

Solution

Installation and mechanical bonding of FeZn 25x4mm strip to the foundation reinforcement. Installation of standard cross-clamps and corrosion protection for test joints and lightning protection leads.

Result

Grounding continuity and resistance successfully achieved in accordance with technical regulations. System ready for main equipotential bonding connection.

Equipment used:-