All projects

Electrical Installations / Grounding Systems
Family House, Murvica
Murvica, Zadar2024/25
Challenge
Installation of a foundation earthing system according to the execution project at a location with specific geological conditions (limestone/karst).
Solution
Installation and mechanical bonding of FeZn 25x4mm strip to the foundation reinforcement. Installation of standard cross-clamps and corrosion protection for test joints and lightning protection leads.
Result
Grounding continuity and resistance successfully achieved in accordance with technical regulations. System ready for main equipotential bonding connection.
Equipment used:-